Project
Current position > Projects > Municipal project
Roads construction of the municipal roads in the southern part of the Gaotang New Area in Tianhe software park and water drainage 2-bid project
Release time:2015-06-12
The width of the road is 30m and the length is 902m. We are responsiblefor the road construction, water drainage project and bridge ancillary works. Wealso contract the road foundation construction, asphalt concretepavement construction, water supply and drainage project (including rain waterand waste water), sidewalk engineering and soft clay disposal of cement mixingpile. Open completion time: 2012.6 - 2012.10.30 Construction cost: 1072 Million yuan Awards:Excellent
Address: Guangdong Province Guangzhou city Haizhuqu District South Island Road Xijiao 11 Street No. 12 TEL:020-84012668 FAX:020-84011360
Copyright © 2015 Guangdong Chang Hang Construction Engineering Co.,Ltd All Rights Reserved. 粤ICP备05138076号
Copyright © 2015 Guangdong Chang Hang Construction Engineering Co.,Ltd All Rights Reserved. 粤ICP备05138076号

