Project
Current position > Projects > Municipal project
Traffic regulation project of the west ring road of the island, southern part of Jingzhu Avenue, Tingjiao interchange in Guangzhou Nansha development zone
Release time:2015-06-12
We areresponsible for the construction engineering of the following three roads: 1. Theroad section between the entrance of the Jingang Avenue near western ring roadof the island is under construction. The total length of the road is 9.1km andthe width is 23m. It is a two-way, six-lane road.
2. The roadsection near Meishan Industrial Park in the southern part of Jinzhu Avenue
3. All the ringroads, exit and entrance of the Tingjiao Viaduct (It is a viaduct of threefloors with 4 through roads and 8 exists). The working issues contain thetraffic lines, signs, signal groups, signal controller installation andunderground cable pipe canal, connection well construction, afforestationproject and restoration project of some green belts and asphalt paving of cyclelane after demolition of traffic channelization. Open completion time: since 2009.12.30 Construction cost: 706 Million yuan Awards:Excellent
Address: Guangdong Province Guangzhou city Haizhuqu District South Island Road Xijiao 11 Street No. 12 TEL:020-84012668 FAX:020-84011360
Copyright © 2015 Guangdong Chang Hang Construction Engineering Co.,Ltd All Rights Reserved. 粤ICP备05138076号
Copyright © 2015 Guangdong Chang Hang Construction Engineering Co.,Ltd All Rights Reserved. 粤ICP备05138076号

