Road construction engineering of the central district in Luogang-8# municipal extension line and its accessory projects
Release time:2015-06-12
The total length of theroad is about 2380m and the newly constructed part is about 880m long while thereconstructed part is 1500m long. The width of the road ranges from 26 to 30m.It is a two-way, four-lane road. We are mainly responsible for the asphaltpaving of the mentioned road sections, the construction of 2 intermediate axlesand cable pit, water supply and drainage(including rain and sewage) project,transportation and illuminating projects as well as pipe and concretefoundation construction. Open completion time: 2008.11.8 - 2011.6.30 Construction cost: 11067 Million yuan Awards:Good municipal sample works of Guangdong Province in 2012;Good sample works of Guangzhou in 2012;Be awarded safe and civilized construction site sample by Guangdong Province in 2011;AA standardized safe and civilized building site in Guangdong in 2011
Copyright © 2015 Guangdong Chang Hang Construction Engineering Co.,Ltd All Rights Reserved. 粤ICP备05138076号