Current position > Projects > Others

mechanical and electric equipment installation engineering of Qiaopeng Square

Release time:2015-06-12

Frame-Shearwall structure, a building with 30 floors in which three ones are underground. Thegeneral area is 128005m2.The foundation is bored pile. We contract the electrical, water supply anddrainage and ventilation engineering. 

Open completion time: 2000.4.17 - 2001.12.28
Construction cost: 120000000 (1200) Million yuan
Awards:Guangzhou high quality projects in2002;Be awarded safe and civilized construction site sample in 2000


 

Address: Guangdong Province Guangzhou city Haizhuqu District South Island Road Xijiao 11 Street No. 12    TEL:020-84012668    FAX:020-84011360
Copyright © 2015 Guangdong Chang Hang Construction Engineering Co.,Ltd All Rights Reserved.   粤ICP备05138076号