General contract for the municipal roads in Jiulong Zhongtai Avenue and accessory project

Release time:2015-06-12

The total length of the road is 2.22km and the width is 40m. It startsfrom K0+000 to K2+220.347. We contract road construction, water supply anddrainage project (including rain and waste water), soft ground engineering aswell as bridge engineering, electric trench project, transportationengineering, streetlight illuminating engineering, telecommunication channelconstruction, pipeline project, protection and movement of pipeline project andso on. 

Open completion time: since2009.6.30
Construction cost: 12215 Million yuan


 