Current position > Projects

Projects

Roads renewal project of Kaitai and Kaifa(Kexiang Avenue-Guangshen highway )

Roads renewal project of Kaitai and Kaifa(Kexiang Avenue-Guangshen highway )

The total length of the project is 16.05km. It is to reconstruction the 10.38 road of Kaitai Avenue (Kexiang Road-Lianyun Road) and the 5.67 sidewalk (Lianyun Road-Guangshen highway). We are responsib...Read more >>

General contract for the municipal roads around WELDON HOTEL and accessory project

General contract for the municipal roads around WELDON HOTEL and accessory project

We contract related municipal projects including municipal roads construction around the hotel, water supply and drainage of the square and outdoor space, outdoor electric engineering, retaining wall ...Read more >>

Roads construction of the municipal roads in the southern part of the Gaotang New Area in Tianhe software park and water drainage 2-bid project

Roads construction of the municipal roads in the southern part of the Gaotang New Area in Tianhe software park and water drainage 2-bid project

The width of the road is 30m and the length is 902m. We are responsible for the road construction, water drainage project and bridge ancillary works. We also contract the road foundation construction,...Read more >>

Road construction engineering of the central district in Luogang-8# municipal extension line and its accessory projects

Road construction engineering of the central district in Luogang-8# municipal extension line and its accessory projects

The total length of the road is about 2380m and the newly constructed part is about 880m long while the reconstructed part is 1500m long. The width of the road ranges from 26 to 30m. It is a two-way, ...Read more >>

General contract for the reconstruction engineering of distribution of rain and sewage in Xilang Village Community

General contract for the reconstruction engineering of distribution of rain and sewage in Xilang Village Community

The repaired area of the road is about 13928m2 and the total length of the outlet header is about 6473m...Read more >>

Waste water treatment project in Longgui phase I Partial pipe net construction of the western part in Longgui

Waste water treatment project in Longgui phase I Partial pipe net construction of the western part in Longgui

Pipe laying, structure constructing, foundation treatment, broken roads repair and some other accessory engineering constructions related to sewer line engineering are our duties. The contaminated are...Read more >>

General contract for storm-sewage diversion construction in Sushe Street Wanshou-Panlong District

General contract for storm-sewage diversion construction in Sushe Street Wanshou-Panlong District

We are responsible for the pipe reconstruction, road rebuilding project and the accessory construction. The area of the repairing part of the road is about 5700m2 and the length of the sewer is about ...Read more >>

Traffic regulation project of the west ring road of the island, southern part of Jingzhu Avenue, Tingjiao interchange in Guangzhou Nansha development zone

Traffic regulation project of the west ring road of the island, southern part of Jingzhu Avenue, Tingjiao interchange in Guangzhou Nansha development zone

We are responsible for the construction engineering of the following three roads: 1. The road section between the entrance of the Jingang Avenue near western ring road of the island is under construct...Read more >>

Bid III reconstruction project of Fangcun Avenue

Bid III reconstruction project of Fangcun Avenue

We contract the roads construction engineering, water supply and drainage project and bridge engineering. It is a two-way, eight-lane road. The total length of the road is 2510m. We are also responsib...Read more >>

Municipal infrastructure project of Guangzhou Physical Training College

Municipal infrastructure project of Guangzhou Physical Training College

We contract the roads construction engineering, water supply and drainage project. The width of the road ranges from 4 to 30m. We are also responsible for the foundation construction, asphalt paving p...Read more >>

Bid IV reconstruction project of Jiulong Avenue

Bid IV reconstruction project of Jiulong Avenue

The total length of the road is 1.7km and the width ranges from 40 to 50m. It starts from K5+300 to K7+000. It is a two-way, six-lane road. We contract road foundation construction, water supply and d...Read more >>

Bid I project of the middle boulevard in Zhujiang New Town

Bid I project of the middle boulevard in Zhujiang New Town

We contract the civic roads construction, water supply and drainage project and asphalt paving project. The width of the road is 32m and the total length is about 840m. It is a two-way, six-lane road...Read more >>

Dapeng Villa

Dapeng Villa

Frame construction, 6 10-storey buildings, construction area of 38492.78m2, the foundation of the buildings are φ400 static pressure pipe pile...Read more >>

Jiangnan Avenue South residential building

Jiangnan Avenue South residential building

Frame construction, a 18-storey building, 2-floor basement, construction area of 9470m2, the foundation of the building is artificial dig hole piles...Read more >>

Southern part of Jinya Park(3 phrases)

Southern part of Jinya Park(3 phrases)

Frame construction, a 12-storey building, 1-floor basement, construction area of 24000m2, the foundation of the building is artificial dig hole piles...Read more >>

Address: Guangdong Province Guangzhou city Haizhuqu District South Island Road Xijiao 11 Street No. 12    TEL:020-84012668    FAX:020-84011360