Current position > Projects
Projects
Systematic reconstruction of Daguan Road and Chebei Road and grade-separation civic work of the Olympic Center(2-bid section)
The total length of the road is 400m and the length of the viaduct is 345m (with a span of 42m). The tunnel is about 36605m. It is an asphalt paving project...Read more >>
Civic works of Luoxuan Road construction in Gunagzhou International Gunahzou Island
The total length of the road is 1726.667m and the width is 30m. We mainly contract road construction, water supply and drainage project (including rain and sewage), transportation construction and ill...Read more >>
Xinguang south-north orbital road construction in Guanghzou Science City and related water supply and drainage project
We contract the road construction, water supply and drainage project. The width of the road is 30m and the total length is 2235m. It is a two-way, six-lane road. We are also responsible for road found...Read more >>
Road construction of Civic Road Section I of surrounding road of Guangzhou International Guanzhou Island
We contract the road construction, water supply and drainage project. The width of the road is 26m and the total length is 2200m. It is a two-way, four-lane road. We are also responsible for road foun...Read more >>
Civil works of solid waste sanitary landfill site in Xingfeng Guangzhou City
Earth-rock structure and double anti-infiltration structure in which the cubage of excavation is 380804m3 and the filling body is 139255m3. The modeling area is 109823.4m2. We are responsible for the ...Read more >>
General contract for the community renewal in Dongjiao District A (phase I)
It is a residence with a general construction area of 63070m2. There are three buildings in total, coding A1, A2, A3. There are 28 floors over ground, adding up to 46143.20m2 and 3 floors underground,...Read more >>
Professional contract for movement and reconstruction engineering projects of specialism clinic and inspection clinic in Guangzhou Chest Hospital
Construction area: 2077.67m2(specialism clinic for 1123m2 and inspection clinic for 954.67m2. The building used for specialism has four floors and the one used for inspection has 2 floors). We are res...Read more >>
Phase I、II、III construction engineering of the standard factory building located in Hefeng Street in Yonghe Road
Frame construction, 3-5 storey of 5#building, construction area of 58350m2, the foundation of the building is pipe pile. Contract for civil work, mechanical and electric equipment installation, pipe n...Read more >>
Tianlu Southern Compound construction engineering(phase I, bid-section 3)
The general construction area is about 88000m2. The construction range includes the 16-18 floors of 9 buildings(#18-#20、#25-#30), rubbish dealing room and one floor of basement. We contract the decor...Read more >>
Construction engineering of the standard industry unit in Guanzhou Island(phase II)
The general area of construction is 81009.79m2, mainly includes production workshop, pilot factory, office building and production premise. The engineering issues contain civil work of foundation ditc...Read more >>
General contract for Fangcun Garden phase II and for the management service of the seventh bid-section
The general area of construction is about 54800m2 which includes a conjunctional basement and two 28-storey middle corridor type towers and a primary school. The construction area of the over-ground p...Read more >>
ZHUJIANG-INBEV INTERNATIONAL BEER MUSEUM
Frame structure, construction area of 7700m2, the area of the foundation is 3128m2. The total height of the building is 23m and three floors are above the ground. The height of the first and second fl...Read more >>
Professional contract for foundation pit support construction and earth excavation engineering of the Xiaoping Village community and Datang new community in Guangzhou Ciry
The foundation ditch occupies 6000m2 and the depth of the pit is 6m. The estimated quantity is 36000m3. And the engineering is planned to use deep whisk cement stake as the support of the retaining wa...Read more >>
Phase III of the residential building Four Seasons Villa
Frame-Shear wall structure, a sum of seven buildings containing A4-A7、B1、D2、D3. The general construction area is 61081m2. The foundation is artificial hole digging pile. Only one floor is a basemen...Read more >>
A1A2 civil engineering work of the A cluster engineering in integrative research and development quarter of Guangdong academy town
Frame-Shear structure, 3# 3-15storey of the building, construction area of 59616m2. The foundation of the contracted building is bored pile. Also, the foundations of the buildings are hole dogging pil...Read more >>
Copyright © 2015 Guangdong Chang Hang Construction Engineering Co.,Ltd All Rights Reserved. 粤ICP备05138076号